EUR Document Volumes 2 & 4

Scope of Volume 2

The EUR Document Volume 2 contains all the generic requirements and preferences of the EUR utilities for a nuclear island, and common requirements for nuclear island and power generation plant. 

Several of these requirements are kept open, i. e. they provide only a design methodology and objectives that can be implemented in several ways by the Plant Designer.

The EUR Document Volume 2 contains chapters which aim to tackle specific topics related to plant design and construction. Together they cover the whole scope of the activities that are necessary in order to design, license, build, test and operate a Nuclear Island together with some of the related site facilities.

Scope of Volume 4

The EUR Document Volume 4 contains the requirements specific to the Power Generation Plant (Turbine Island and Balance of Plant). It is written as a complement to Volume 2.

Table of contents of Volume 2

Download all the chapters
File Date Size
2.01 SAFETY REQUIREMENTS 10-13-2022 643981 K Download
2.02 PERFORMANCE REQUIREMENTS 10-13-2022 589481 K Download
2.03 GRID REQUIREMENT 10-13-2022 589081 K Download
2.04 DESIGN BASIS 04-13-2023 623038 K Download
2.05 CODES AND STANDARDS 10-13-2022 574175 K Download
2.06 MATERIAL-RELATED REQUIREMENTS 10-13-2022 587700 K Download
2.07 FUNCTIONAL REQUIREMENTS: COMPONENTS 10-13-2022 638544 K Download
2.08 FUNCTIONAL REQUIREMENTS: SYSTEMS & PROCESSES 10-13-2022 673725 K Download
2.09 CONTAINMENT SYSTEM 10-13-2022 628974 K Download
2.10 INSTRUMENTATION & CONTROL AND HUMAN-MACHINE INTERFACE 10-13-2022 626042 K Download
2.11 LAYOUT 10-13-2022 598959 K Download
2.12 DESIGN PROCESS AND DOCUMENTATION 10-13-2022 592153 K Download
2.13 CONSTRUCTABILITY AND COMMISSIONING 10-13-2022 583139 K Download
2.14 OPERATION, MAINTENANCE AND PROCEDURES 10-13-2022 590688 K Download
2.15 QUALITY ASSURANCE 10-13-2022 570285 K Download
2.16 DECOMMISSIONING 10-13-2022 569679 K Download
2.17 PSA METHODOLOGY 10-13-2022 596420 K Download
2.18 PERFORMANCE ASSESSMENT METHODOLOGY 10-13-2022 582763 K Download
2.19 COST ASSESSMENT INFORMATION REQUIREMENTS 10-13-2022 575664 K Download
2.20 ENVIRONMENTAL IMPACT 10-13-2022 579991 K Download

Table of contents of Volume 4

Download all the chapters
File Date Size
4.01 INTRODUCTION TO VOLUME 4 10-13-2022 577804 K Download
4.02 MAIN TURBINE GENERATOR SYSTEMS 10-13-2022 611945 K Download
4.03 STEAM, CONDENSATE AND FEEDWATER SYSTEM 10-13-2022 623913 K Download
4.04 ELECTRIC POWER SYSTEMS 10-13-2022 588499 K Download
4.05 CIRCULATING POWER SYSTEMS 10-13-2022 586462 K Download
4.06 AUXILIARY SYSTEMS 10-13-2022 601248 K Download